Full Property Modernisation

Project Overview

Large detached London property in need of modernisation throughout. Work included an extension to the ground floor, loft conversion, new family environment.

This project was all about family life. Our planning and advice was all around creating an environment for the family to growth together. We extended the roof for a complete new loft conversion. This created two new large bedrooms with aspects overlooking the rear south facing garden. Along with a Jake & Jill bathroom

Added an extension to incorporate an open plan kitchen and bespoke patio doors, making the garden part of the home. Redesigned internal layout and positioning of new staircase.

Project Plan

This was a fantastic project for SBC, we work with the client right from the conception of the vision. Our brief was to create an environment for a family to flourish. It was all about maximising the space while creating a flow to home that included all.

Client would vacate while SBC Ltd were on site

Support design work and advise on floor plan. Including repositioning of Staircase to increase the flow of light.

Gut the whole property

Structural Ground work

Scaffolding for complete removal of roof. Create a brick gable end to enlarge the roof space. Design and build a full timber roof to incorporate the use of a apex front elevation in one room and a new dormer to the second bedroom.

Build an extension on to the rear of the property to provide open plan kitchen with feature roof lantern. Bespoke sliding double doors, bringing the south facing garden into the living space.

Timing

The mission was for the family to be in by Christmas, this gave 12 months to complete the full project.

Timeline

To be updated

Points of note

To be honest the question is were to start with our list of things to note. The size of the project and management of timing was critical here. Project managing so many different stakeholders was perfect for our management team. This in turn feed back into our key to success, regular clear and concise customer project approval throughout.

The Christmas deadline gave all the team a sense of ambition and this for me is the key note. Helping a family understand, plan and realise a dream is second to none. A point of note that eclipses all others.